← All case studies
Water reuse · Case study

Reducing energy use without rebuilding the plant.

10%Expected energy reduction
<3 yearsExpected payback
RetrofitMinimal new equipment

The challenge

A major water-recycling utility wanted to reduce energy consumption with minimal implementation cost.

The approach

Rick developed a process retrofit design using low-pressure energy-recovery devices, with minimal additional new equipment.

The result

The retrofit is expected to reduce energy consumption by 10%, with a payback of less than three years.

Status: Rick Stover’s prior professional experience. Energy and payback figures are expected results of the retrofit design. The pictures are illustrations, not images of the plant.