Industrial water · Case study

Designing for guaranteed 100% uptime at a semiconductor fab.

5 MGDDesign flow (19,000 m³/day)
>98%Design recovery
100%Uptime guarantee required of the EPC contractor
ZLDZero liquid discharge
Conceptual treatment architecture: wastewater pretreatment, multi-stage reclaim RO, multi-stage OARO brine concentration and a brine crystallizer, with permeate returned for water reuse

The challenge

A major semiconductor manufacturer needed to treat 19,000 m³/day (5 MGD) of wastewater with zero liquid discharge (ZLD) – and the system could not be allowed to stop.

The approach

As part of the owner’s engineering team, Rick’s team designed, costed, and specified a multi-stage RO and OARO process, integrating upstream ion-exchange softening and downstream crystallization.

The design incorporated redundancy and other features to assure continuous operation.

The result

The design targets more than 98% recovery. The project was awarded to an EPC contractor that was required to guarantee 100% uptime.

Status: Rick Stover’s prior professional experience. Figures are design targets and contract requirements; startup is expected in late 2027, so no operating results are available yet. The process diagram is conceptual.